Our Projects


Gunning Transmission & Distribution ​Services
. Responsibility for the commissioning of Checkerhouse 132/33kV Substation transformer, switchgear and protection changes 
. Responsibility for the commissioning of 132kV Circuit Breakers replacements at Willesden, Coventry and Ironbridge National Grid substations.
.Responsibility for Indian Queens Shunt Reactor 2 Commissioning for Powells Engineering
. Substation Control Systems replacement commissioning at Alverdiscot, Hinkely Point B, Bredbury, Salt End North, and Enderby National Grid Substations.
. Selective Protection Asset Replacement commissioning services at Swansea, Pembroke, Barking, Redbridge and Kirkby National Grid Substations.
. Supergrid Transformers Tertiary Connections commissioning for Battery Storage at Nursling and Ocker Hill National Grid Substations.



ABB Twineham Onshore Substation on behalf of EON
• Responsibility for the commissioning of 150kV and 400kV interconnector Onshore Substation at Twineham 400/150KV S/S).
• Stage 1 testing of protection and control ABB and Alstom IEDs including CT primary injections and magnetisation curves on the feeders, harmonic filters and transformers.
• Stage 1 testing of switchgear including all functional checks.
• Witnessing of all contractor testing of equipment such as cables, transformers, disconnectors, circuit breakers, earthing switches, surge arrestors and SCADA systems.


Powell Engineering
 . Responsibility for the commissioning of 132kV and 400kV Circuit Breakers at Ironbridge and Legacy Substations (132kV bus coupler and bus section CBs at Ironbridge 132kV S/S and SGT2 CB X210 and CB280 exchanges at Legacy 400/132KV S/S). Stage 1 and Stage 2 Commissioning of new CBs Interface according to National Grid TP106 and TP141 procedures for Powell Engineering. Preparation of commissioning schedules and compilation of commissioning files. Preparation of method statements and risk assessments for tasks at hand.​

AMEY Power Services 
• Responsibility for the commissioning of 275/132KV SGT1 (Transformer exchange at Norton 400/275/132KV S/S 
• Stage 1 and Stage 2 Commissioning of SGT1 Interface according to National Grid TP106 and TP141 procedures for AMEY Power Services.
• Preparation of commissioning schedules and compilation of commissioning files.
• Preparation of method statements and risk assessments for tasks at hand


Morson Projects – on behalf of Balfour Beatty 
• Responsibility for the commissioning of NICAP Protection changes at Tinsley Park – Brinsworth 275kv substations on Tinsley Park -Brinsworth 1 Feeder
• Stage 1 and Stage 2 Commissioning of GE – Balfour Beatty protection relays according to National Grid TP106 and TP141 procedures for Balfour Beatty Engineering Services.
• Factory Acceptance Testing of GE Protection and Control IEDs.
• Configuration and Settings checks and testing on protection and control numeric relays.
• Preparation of commissioning schedules and compilation of commissioning files.
• Preparation of method statements and risk assessments for tasks at hand.


​Ellesfield UK – on behalf of Siemens and Omexom
• Commissionining of Blythe Substation Cyber Security Scheme firmware upgrades.
. Commissioning of Coventry and Brindley Battery Storage Systems on Siemens switchgear and protection systems as well as SCADA.
. Commissioning of medium voltage busbar extensions and protection systems at Starbeck, Tata Steel Wales and Gloucester Substations.

       www.tendesthlimited.com  22 Aldersleigh Drive, Stafford, ST17 4RY +441785663293
Site powered by Weebly. Managed by FreeLogoServices.com
  • Home
  • Who We Are
  • Our Experience & Expertise
  • Our Projects
  • Blog
  • Contact Us